Language
Your Cart 0
€0.00

Standard IE1 Three Phase aluminium frame IEC Electric Motors - BMT Series

Manufacturer:
BERNATI

Bernati’s BMT three-phase motor series is built within a cutting-edge technology, with a simple and robust design and in compliance with IEC standards. BMT three phase aluminium motors covers the product range with outputs from 0.09kW to 22.00kW in frame sizes IEC56 to IEC160, in either 2,4,6 or 8 pole speeds. The aluminium cast ensures high resistance to corrosion and atmospheric attack, and has a much lighter weight when compared to cast iron frames.

These series with an aluminium housing are suitable for a wide range of standard applications in the industrial environment, due to their particular low weight, such as pumps, fans, compressor, and even in conveyor systems and lifting gear.

BMT series design ensure maximum flexibility and minimum installation costs. The frame design reduces the air flow dispersion and ensures an increased of heat transfer between motor and environment, reducing hot spots on the frame surface and extending the bearing lubrication intervals.

BMT Series - Three phase motors with aluminium frame, with efficiency rating IE1, size from 56 to 160, output from 0.09kW to 22.00kW, with 2, 4, 6 & 8 poles.

SKU Mounting Position Output (kW/hp) Poles number / RPM Frame Size Noise (dBA) Shipped In Price *
BMT1009.05C414.11 B14 (Flange) 0.09/0.12 4/1500 56 50 1-2 Days €38.40
BMT1009.05C403.11 B3 (Feet) 0.09/0.12 4/1500 56 50 1-2 Days €37.30
BMT1012.05C234.11 B3/B14 (Feet & Flange) 0.12/0.16 2/3000 56 58 1-2 Days €37.70
BMT1012.06B414.11 B14 (Flange) 0.12/0.16 4/1500 63 52 1-2 Days €41.40
BMT1012.06B405.11 B5 (Flange) 0.12/0.16 4/1500 63 52 1-2 Days €41.40
BMT1012.06C614.11 B14 (Flange) 0.12/0.16 6/1000 63 50 1-2 Days €45.70
BMT1012.06C605.11 B5 (Flange) 0.12/0.16 6/1000 63 50 4-5 Days €45.70
BMT1018.06C414.11 B14 (Flange) 0.18/0.24 4/1500 63 52 1-2 Days €44.70
BMT1018.06C403.11 B3 (Feet) 0.18/0.24 4/1500 63 52 1-2 Days €43.40
BMT1018.06C405.11 B5 (Flange) 0.18/0.24 4/1500 63 52 1-2 Days €44.70
BMT1025.06C214.11 B14 (Flange) 0.25/0.34 2/3000 63 61 1-2 Days €44.70
BMT1025.06C203.11 B3 (Feet) 0.25/0.34 2/3000 63 61 1-2 Days €43.50
BMT1025.07B414.11 B14 (Flange) 0.25/0.34 4/1500 71 55 1-2 Days €55.40
BMT1025.06D414.11 B14 (Flange) 0.25/0.34 4/1500 63 55 1-2 Days €48.20
BMT1025.07B403.11 B3 (Feet) 0.25/0.34 4/1500 71 55 1-2 Days €53.80
BMT1025.07B405.11 B5 (Flange) 0.25/0.34 4/1500 71 55 1-2 Days €55.40
BMT1025.07C614.11 B14 (Flange) 0.25/0.34 6/1000 71 52 1-2 Days €59.10
BMT1025.07C603.11 B3 (Feet) 0.25/0.34 6/1000 71 52 1-2 Days €57.40
BMT1037.07B214.11 B14 (Flange) 0.37/0.50 2/3000 71 64 1-2 Days €54.70
BMT1037.06D214.11 B14 (Flange) 0.37/0.50 2/3000 63 62 1-2 Days €47.80
BMT1037.07B203.11 B3 (Feet) 0.37/0.50 2/3000 71 64 1-2 Days €53.10
BMT1037.07C414.11 B14 (Flange) 0.37/0.50 4/1500 71 55 4-5 Days €59.30
BMT1037.07C403.11 B3 (Feet) 0.37/0.50 4/1500 71 55 4-5 Days €57.60
BMT1037.07C405.11 B5 (Flange) 0.37/0.50 4/1500 71 55 4-5 Days €59.30
BMT1037.08B614.11 B14 (Flange) 0.37/0.50 6/1000 80 56 1-2 Days €70.90
BMT1037.08B603.11 B3 (Feet) 0.37/0.50 6/1000 80 56 1-2 Days €68.80
BMT1055.07C203.11 B3 (Feet) 0.55/0.75 2/3000 71 64 1-2 Days €56.80
BMT1055.07C205.11 B5 (Flange) 0.55/0.75 2/3000 71 64 1-2 Days €58.50
BMT1055.08B414.11 B14 (Flange) 0.55/0.75 4/1500 80 57 1-2 Days €70.30
BMT1055.07D414.11 B14 (Flange) 0.55/0.75 4/1500 71 57 1-2 Days €64.50
BMT1055.08B403.11 B3 (Feet) 0.55/0.75 4/1500 80 57 1-2 Days €68.20
BMT1055.08B434.11 B3/B14 (Feet & Flange) 0.55/0.75 4/1500 80 57 4-5 Days
BMT1055.08B405.11 B5 (Flange) 0.55/0.75 4/1500 80 57 1-2 Days €70.30
BMT1055.07D405.11 B5 (Flange) 0.55/0.75 4/1500 71 57 4-5 Days €64.50
BMT1055.08C614.11 B14 (Flange) 0.55/0.75 6/1000 80 56 1-2 Days €92.60
BMT1055.08C603.11 B3 (Feet) 0.55/0.75 6/1000 80 56 1-2 Days €89.90
BMT1110.08D403.11 B3 (Feet) 1.10/1.50 4/1500 80 61 1-2 Days
BMT1110.08D405.11 B5 (Flange) 1.10/1.50 4/1500 80 61 1-2 Days €92.35
BMT1220.09J403.11 B3 (Feet) 2.20/2.99 4/1500 90L 64 1-2 Days
BMT1220.09J405.11 B5 (Flange) 2.20/2.99 4/1500 90L 64 1-2 Days €131.00
BMT1550.11F403.11 B3 (Feet) 5.50/7.48 4/1500 112M 71 1-2 Days €304.09
BMT1009.05B214.11 B14 (Flange) 0.09/0.12 2/3000 56 58 4-5 Days €33.80
BMT1009.05B203.11 B3 (Feet) 0.09/0.12 2/3000 56 58 4-5 Days €32.80
BMT1009.05B234.11 B3/B14 (Feet & Flange) 0.09/0.12 2/3000 56 58 4-5 Days €34.50
BMT1009.05B235.11 B3/B5 (Feet & Flange) 0.09/0.12 2/3000 56 58 4-5 Days €34.50
BMT1009.05B205.11 B5 (Flange) 0.09/0.12 2/3000 56 58 4-5 Days €33.80
BMT1009.05C434.11 B3/B14 (Feet & Flange) 0.09/0.12 4/1500 56 50 4-5 Days €39.10
BMT1009.05C435.11 B3/B5 (Feet & Flange) 0.09/0.12 4/1500 56 50 4-5 Days €39.10
BMT1009.05C405.11 B5 (Flange) 0.09/0.12 4/1500 56 50 4-5 Days €38.40
BMT1009.06B614.11 B14 (Flange) 0.09/0.12 6/1000 63 50 4-5 Days €43.60
BMT1009.06B603.11 B3 (Feet) 0.09/0.12 6/1000 63 50 4-5 Days €42.30
BMT1009.06B634.11 B3/B14 (Feet & Flange) 0.09/0.12 6/1000 63 50 4-5 Days €44.40
BMT1009.06B635.11 B3/B5 (Feet & Flange) 0.09/0.12 6/1000 63 50 4-5 Days €44.40
BMT1009.06B605.11 B5 (Flange) 0.09/0.12 6/1000 63 50 4-5 Days €43.60
BMT1009.07B814.11 B14 (Flange) 0.09/0.12 8/750 71 50 4-5 Days €59.60
BMT1009.07B803.11 B3 (Feet) 0.09/0.12 8/750 71 50 4-5 Days €57.80
BMT1009.07B834.11 B3/B14 (Feet & Flange) 0.09/0.12 8/750 71 50 4-5 Days €60.70
BMT1009.07B835.11 B3/B5 (Feet & Flange) 0.09/0.12 8/750 71 50 4-5 Days €60.70
BMT1009.07B805.11 B5 (Flange) 0.09/0.12 8/750 71 50 4-5 Days €59.60
BMT1012.05C214.11 B14 (Flange) 0.12/0.16 2/3000 56 58 1-2 Days €37.00
BMT1012.05C203.11 B3 (Feet) 0.12/0.16 2/3000 56 58 4-5 Days €35.90
BMT1012.05C235.11 B3/B5 (Feet & Flange) 0.12/0.16 2/3000 56 58 4-5 Days €37.70
BMT1012.05C205.11 B5 (Flange) 0.12/0.16 2/3000 56 58 4-5 Days €37.00
BMT1012.05D414.11 B14 (Flange) 0.12/0.16 4/1500 56 52 4-5 Days €41.40
BMT1012.06B403.11 B3 (Feet) 0.12/0.16 4/1500 63 52 4-5 Days €40.20
BMT1012.05D403.11 B3 (Feet) 0.12/0.16 4/1500 56 52 4-5 Days €40.20
BMT1012.06B434.11 B3/B14 (Feet & Flange) 0.12/0.16 4/1500 63 52 4-5 Days €42.20
BMT1012.05D434.11 B3/B14 (Feet & Flange) 0.12/0.16 4/1500 56 52 4-5 Days €42.20
BMT1012.06B435.11 B3/B5 (Feet & Flange) 0.12/0.16 4/1500 63 52 4-5 Days €42.20
BMT1012.05D435.11 B3/B5 (Feet & Flange) 0.12/0.16 4/1500 56 52 4-5 Days €42.20
BMT1012.05D405.11 B5 (Flange) 0.12/0.16 4/1500 56 52 4-5 Days €41.40
BMT1012.06C603.11 B3 (Feet) 0.12/0.16 6/1000 63 50 4-5 Days €44.40
BMT1012.06C634.11 B3/B14 (Feet & Flange) 0.12/0.16 6/1000 63 50 4-5 Days €46.60
BMT1012.06C635.11 B3/B5 (Feet & Flange) 0.12/0.16 6/1000 63 50 4-5 Days €46.60
BMT1012.07C814.11 B14 (Flange) 0.12/0.16 8/750 71 50 4-5 Days €61.70
BMT1012.07C803.11 B3 (Feet) 0.12/0.16 8/750 71 50 4-5 Days €59.90
BMT1012.07C834.11 B3/B14 (Feet & Flange) 0.12/0.16 8/750 71 50 4-5 Days €62.90
BMT1012.07C835.11 B3/B5 (Feet & Flange) 0.12/0.16 8/750 71 50 4-5 Days €62.90
BMT1012.07C805.11 B5 (Flange) 0.12/0.16 8/750 71 50 4-5 Days €61.70
BMT1018.06B214.11 B14 (Flange) 0.18/0.24 2/3000 63 61 1-2 Days €42.30
BMT1012.05D214.11 B14 (Flange) 0.18/0.24 2/3000 56 61 4-5 Days €39.50
BMT1018.06B203.11 B3 (Feet) 0.18/0.24 2/3000 63 61 1-2 Days €41.10
BMT1012.05D203.11 B3 (Feet) 0.18/0.24 2/3000 56 61 4-5 Days €38.40
BMT1018.06B234.11 B3/B14 (Feet & Flange) 0.18/0.24 2/3000 63 61 4-5 Days €43.20
BMT1012.05D234.11 B3/B14 (Feet & Flange) 0.18/0.24 2/3000 56 61 4-5 Days €40.30
BMT1018.06B235.11 B3/B5 (Feet & Flange) 0.18/0.24 2/3000 63 61 4-5 Days €43.20
BMT1012.05D235.11 B3/B5 (Feet & Flange) 0.18/0.24 2/3000 56 61 4-5 Days €40.30
BMT1018.06B205.11 B5 (Flange) 0.18/0.24 2/3000 63 61 1-2 Days €42.30
BMT1012.05D205.11 B5 (Flange) 0.18/0.24 2/3000 56 61 4-5 Days €39.50
BMT1018.06C434.11 B3/B14 (Feet & Flange) 0.18/0.24 4/1500 63 52 4-5 Days €45.50
BMT1018.06C435.11 B3/B5 (Feet & Flange) 0.18/0.24 4/1500 63 52 4-5 Days €45.50
BMT1018.07B614.11 B14 (Flange) 0.18/0.24 6/1000 71 52 1-2 Days €55.70
BMT1018.06D614.11 B14 (Flange) 0.18/0.24 6/1000 63 52 4-5 Days
BMT1018.07B603.11 B3 (Feet) 0.18/0.24 6/1000 71 52 4-5 Days €54.10
BMT1018.06D603.11 B3 (Feet) 0.18/0.24 6/1000 63 52 4-5 Days
BMT1018.07B634.11 B3/B14 (Feet & Flange) 0.18/0.24 6/1000 71 52 4-5 Days €56.80
BMT1018.06D634.11 B3/B14 (Feet & Flange) 0.18/0.24 6/1000 63 52 4-5 Days
BMT1018.07B635.11 B3/B5 (Feet & Flange) 0.18/0.24 6/1000 71 52 4-5 Days €56.80
BMT1018.06D635.11 B3/B5 (Feet & Flange) 0.18/0.24 6/1000 63 52 4-5 Days
BMT1018.07B605.11 B5 (Flange) 0.18/0.24 6/1000 71 52 4-5 Days €55.70
BMT1018.06D605.11 B5 (Flange) 0.18/0.24 6/1000 63 52 4-5 Days
BMT1018.08B814.11 B14 (Flange) 0.18/0.24 8/750 80 52 4-5 Days €77.10
BMT1018.08B803.11 B3 (Feet) 0.18/0.24 8/750 80 52 4-5 Days €74.80
BMT1018.08B834.11 B3/B14 (Feet & Flange) 0.18/0.24 8/750 80 52 4-5 Days €78.60
BMT1018.08B835.11 B3/B5 (Feet & Flange) 0.18/0.24 8/750 80 52 4-5 Days €78.60
BMT1018.08B805.11 B5 (Flange) 0.18/0.24 8/750 80 52 4-5 Days €77.10
BMT1025.06C234.11 B3/B14 (Feet & Flange) 0.25/0.34 2/3000 63 61 4-5 Days €45.60
BMT1025.06C235.11 B3/B5 (Feet & Flange) 0.25/0.34 2/3000 63 61 4-5 Days €45.60
BMT1025.06C205.11 B5 (Flange) 0.25/0.34 2/3000 63 61 4-5 Days €44.80
BMT1025.06D403.11 B3 (Feet) 0.25/0.34 4/1500 63 55 4-5 Days €46.80
BMT1025.07B434.11 B3/B14 (Feet & Flange) 0.25/0.34 4/1500 71 55 4-5 Days €56.50
BMT1025.06D434.11 B3/B14 (Feet & Flange) 0.25/0.34 4/1500 63 54 4-5 Days €48.20
BMT1025.07B435.11 B3/B5 (Feet & Flange) 0.25/0.34 4/1500 71 55 4-5 Days €56.50
BMT1025.06D435.11 B3/B5 (Feet & Flange) 0.25/0.34 4/1500 63 55 4-5 Days €49.20
BMT1025.06D405.11 B5 (Flange) 0.25/0.34 4/1500 63 54 1-2 Days €48.20
BMT1025.07C634.11 B3/B14 (Feet & Flange) 0.25/0.34 6/1000 71 52 4-5 Days €60.30
BMT1025.07C635.11 B3/B5 (Feet & Flange) 0.25/0.34 6/1000 71 52 4-5 Days €60.30
BMT1025.07C605.11 B5 (Flange) 0.25/0.34 6/1000 71 52 4-5 Days €59.10
BMT1025.08C814.11 B14 (Flange) 0.25/0.34 8/750 80 52 4-5 Days €89.00
BMT1025.08C803.11 B3 (Feet) 0.25/0.34 8/750 80 52 4-5 Days €86.40
BMT1025.08C834.11 B3/B14 (Feet & Flange) 0.25/0.34 8/750 80 52 4-5 Days €90.70
BMT1025.08C835.11 B3/B5 (Feet & Flange) 0.25/0.34 8/750 80 52 4-5 Days €90.70
BMT1025.08C805.11 B5 (Flange) 0.25/0.34 8/750 80 52 4-5 Days €89.00
BMT1037.06D203.11 B3 (Feet) 0.37/0.50 2/3000 63 62 4-5 Days €46.40
BMT1037.07B234.11 B3/B14 (Feet & Flange) 0.37/0.50 2/3000 71 64 4-5 Days €55.80
BMT1037.06D234.11 B3/B14 (Feet & Flange) 0.37/0.50 2/3000 63 62 4-5 Days €48.70
BMT1037.07B235.11 B3/B5 (Feet & Flange) 0.37/0.50 2/3000 71 64 4-5 Days
BMT1037.06D235.11 B3/B5 (Feet & Flange) 0.37/0.50 2/3000 63 62 4-5 Days €48.70
BMT1037.07B205.11 B5 (Flange) 0.37/0.50 2/3000 71 64 1-2 Days €54.70
BMT1037.06D205.11 B5 (Flange) 0.37/0.50 2/3000 63 62 4-5 Days €47.80
BMT1037.07C434.11 B3/B14 (Feet & Flange) 0.37/0.50 4/1500 71 55 4-5 Days
BMT1037.07C435.11 B3/B5 (Feet & Flange) 0.37/0.50 4/1500 71 55 1-2 Days €60.50
BMT1037.07D614.11 B14 (Flange) 0.37/0.50 6/1000 71 54 4-5 Days €68.80
BMT1037.07D603.11 B3 (Feet) 0.37/0.50 6/1000 71 54 4-5 Days €66.80
BMT1037.08B634.11 B3/B14 (Feet & Flange) 0.37/0.50 6/1000 80 56 4-5 Days €72.20
BMT1037.07D634.11 B3/B14 (Feet & Flange) 0.37/0.50 6/1000 71 54 4-5 Days €70.10
BMT1037.08B635.11 B3/B5 (Feet & Flange) 0.37/0.50 6/1000 80 56 4-5 Days €72.20
BMT1037.07D635.11 B3/B5 (Feet & Flange) 0.37/0.50 6/1000 71 54 4-5 Days €70.10
BMT1037.08B605.11 B5 (Flange) 0.37/0.50 6/1000 80 56 1-2 Days €70.90
BMT1037.07D605.11 B5 (Flange) 0.37/0.50 6/1000 71 54 4-5 Days €68.80
BMT1037.09A814.11 B14 (Flange) 0.37/0.50 8/750 90S 56 4-5 Days €104.00
BMT1037.08D814.11 B14 (Flange) 0.37/0.50 8/750 80 56 4-5 Days
BMT1037.09A803.11 B3 (Feet) 0.37/0.50 8/750 90S 56 4-5 Days €100.90
BMT1037.08D803.11 B3 (Feet) 0.37/0.50 8/750 80 56 4-5 Days
BMT1037.09A834.11 B3/B14 (Feet & Flange) 0.37/0.50 8/750 90S 56 4-5 Days €106.00
BMT1037.08D834.11 B3/B14 (Feet & Flange) 0.37/0.50 8/750 80 56 4-5 Days
BMT1037.09A835.11 B3/B5 (Feet & Flange) 0.37/0.50 8/750 90S 56 4-5 Days €106.00
BMT1037.08D835.11 B3/B5 (Feet & Flange) 0.37/0.50 8/750 80 56 4-5 Days
BMT1037.09A805.11 B5 (Flange) 0.37/0.50 8/750 90S 56 4-5 Days €104.00
BMT1037.08D805.11 B5 (Flange) 0.37/0.50 8/750 80 56 4-5 Days
BMT1055.07C214.11 B14 (Flange) 0.55/0.75 2/3000 71 64 4-5 Days €58.50
BMT1055.07C234.11 B3/B14 (Feet & Flange) 0.55/0.75 2/3000 71 64 4-5 Days €59.70
BMT1055.07C235.11 B3/B5 (Feet & Flange) 0.55/0.75 2/3000 71 64 4-5 Days €59.70
BMT1055.07D403.11 B3 (Feet) 0.55/0.75 4/1500 71 57 4-5 Days €62.70
BMT1055.07D434.11 B3/B14 (Feet & Flange) 0.55/0.75 4/1500 71 57 4-5 Days €65.80
BMT1055.08B435.11 B3/B5 (Feet & Flange) 0.55/0.75 4/1500 80 57 4-5 Days €71.60
BMT1055.07D435.11 B3/B5 (Feet & Flange) 0.55/0.75 4/1500 71 57 4-5 Days €65.80
BMT1055.08C634.11 B3/B14 (Feet & Flange) 0.55/0.75 6/1000 80 56 4-5 Days €94.40
BMT1055.08C635.11 B3/B5 (Feet & Flange) 0.55/0.75 6/1000 80 56 4-5 Days €94.40
BMT1055.08C605.11 B5 (Flange) 0.55/0.75 6/1000 80 56 1-2 Days €92.60
BMT1055.09H814.11 B14 (Flange) 0.55/0.75 8/750 90L 56 4-5 Days €143.80
BMT1055.09H803.11 B3 (Feet) 0.55/0.75 8/750 90L 56 4-5 Days €139.60
BMT1055.09H834.11 B3/B14 (Feet & Flange) 0.55/0.75 8/750 90L 56 4-5 Days €146.50
BMT1055.09H835.11 B3/B5 (Feet & Flange) 0.55/0.75 8/750 90L 56 4-5 Days €146.50
BMT1055.09H805.11 B5 (Flange) 0.55/0.75 8/750 90L 56 4-5 Days €143.80
BMT1075.08B214.11 B14 (Flange) 0.75/1.02 2/3000 80 67 4-5 Days
BMT1075.07D214.11 B14 (Flange) 0.75/1.02 2/3000 71 65 4-5 Days
BMT1075.08B203.11 B3 (Feet) 0.75/1.02 2/3000 80 67 4-5 Days
BMT1075.07D203.11 B3 (Feet) 0.75/1.02 2/3000 71 65 4-5 Days
BMT1075.08B234.11 B3/B14 (Feet & Flange) 0.75/1.02 2/3000 80 67 4-5 Days
BMT1075.07D234.11 B3/B14 (Feet & Flange) 0.75/1.02 2/3000 71 65 4-5 Days
BMT1075.08B235.11 B3/B5 (Feet & Flange) 0.75/1.02 2/3000 80 67 4-5 Days
BMT1075.07D235.11 B3/B5 (Feet & Flange) 0.75/1.02 2/3000 71 65 4-5 Days
BMT1075.08B205.11 B5 (Flange) 0.75/1.02 2/3000 80 67 4-5 Days
BMT1075.07D205.11 B5 (Flange) 0.75/1.02 2/3000 71 65 4-5 Days
BMT1075.08C414.11 B14 (Flange) 0.75/1.02 4/1500 80 58 4-5 Days
BMT1075.08C403.11 B3 (Feet) 0.75/1.02 4/1500 80 58 4-5 Days
BMT1075.08C434.11 B3/B14 (Feet & Flange) 0.75/1.02 4/1500 80 58 4-5 Days
BMT1075.08C435.11 B3/B5 (Feet & Flange) 0.75/1.02 4/1500 80 58 4-5 Days
BMT1075.08C405.11 B5 (Flange) 0.75/1.02 4/1500 80 58 4-5 Days
BMT1075.09A614.11 B14 (Flange) 0.75/1.02 6/1000 90S 59 4-5 Days
BMT1075.08D614.11 B14 (Flange) 0.75/1.02 6/1000 80 58 4-5 Days
BMT1075.09A603.11 B3 (Feet) 0.75/1.02 6/1000 90S 59 4-5 Days
BMT1075.08D603.11 B3 (Feet) 0.75/1.02 6/1000 80 58 4-5 Days
BMT1075.09A634.11 B3/B14 (Feet & Flange) 0.75/1.02 6/1000 90S 59 4-5 Days
BMT1075.08D634.11 B3/B14 (Feet & Flange) 0.75/1.02 6/1000 80 58 4-5 Days
BMT1075.09A635.11 B3/B5 (Feet & Flange) 0.75/1.02 6/1000 90S 59 4-5 Days
BMT1075.08D635.11 B3/B5 (Feet & Flange) 0.75/1.02 6/1000 80 58 4-5 Days
BMT1075.09A605.11 B5 (Flange) 0.75/1.02 6/1000 90S 59 4-5 Days
BMT1075.08D605.11 B5 (Flange) 0.75/1.02 6/1000 80 58 4-5 Days
BMT1075.10I814.11 B14 (Flange) 0.75/1.02 8/750 100L 59 4-5 Days
BMT1075.09J814.11 B14 (Flange) 0.75/1.02 8/750 90L 59 4-5 Days
BMT1075.10I803.11 B3 (Feet) 0.75/1.02 8/750 100L 59 4-5 Days
BMT1075.09J803.11 B3 (Feet) 0.75/1.02 8/750 90L 59 4-5 Days
BMT1075.10I834.11 B3/B14 (Feet & Flange) 0.75/1.02 8/750 100L 59 4-5 Days
BMT1075.09J834.11 B3/B14 (Feet & Flange) 0.75/1.02 8/750 90L 59 4-5 Days
BMT1075.10I835.11 B3/B5 (Feet & Flange) 0.75/1.02 8/750 100L 59 4-5 Days
BMT1075.09J835.11 B3/B5 (Feet & Flange) 0.75/1.02 8/750 90L 59 4-5 Days
BMT1075.10I805.11 B5 (Flange) 0.75/1.02 8/750 100L 59 4-5 Days
BMT1075.09J805.11 B5 (Flange) 0.75/1.02 8/750 90L 59 4-5 Days
BMT1110.08C214.11 B14 (Flange) 1.10/1.50 2/3000 80 67 4-5 Days
BMT1110.08C203.11 B3 (Feet) 1.10/1.50 2/3000 80 67 4-5 Days
BMT1110.08C234.11 B3/B14 (Feet & Flange) 1.10/1.50 2/3000 80 67 4-5 Days
BMT1110.08C235.11 B3/B5 (Feet & Flange) 1.10/1.50 2/3000 80 67 4-5 Days
BMT1110.08C205.11 B5 (Flange) 1.10/1.50 2/3000 80 67 4-5 Days
BMT1110.09A414.11 B14 (Flange) 1.10/1.50 4/1500 90S 61 4-5 Days
BMT1110.08D414.11 B14 (Flange) 1.10/1.50 4/1500 80 61 4-5 Days €92.35
BMT1110.09A403.11 B3 (Feet) 1.10/1.50 4/1500 90S 61 4-5 Days
BMT1110.09A434.11 B3/B14 (Feet & Flange) 1.10/1.50 4/1500 90S 61 4-5 Days
BMT1110.08D434.11 B3/B14 (Feet & Flange) 1.10/1.50 4/1500 80 61 4-5 Days
BMT1110.09A435.11 B3/B5 (Feet & Flange) 1.10/1.50 4/1500 90S 61 4-5 Days
BMT1110.08D435.11 B3/B5 (Feet & Flange) 1.10/1.50 4/1500 80 61 4-5 Days
BMT1110.09A405.11 B5 (Flange) 1.10/1.50 4/1500 90S 61 4-5 Days
BMT1110.09H614.11 B14 (Flange) 1.10/1.50 6/1000 90L 59 4-5 Days
BMT1110.09H603.11 B3 (Feet) 1.10/1.50 6/1000 90L 59 4-5 Days
BMT1110.09H634.11 B3/B14 (Feet & Flange) 1.10/1.50 6/1000 90L 59 4-5 Days
BMT1110.09H635.11 B3/B5 (Feet & Flange) 1.10/1.50 6/1000 90L 59 4-5 Days
BMT1110.09H605.11 B5 (Flange) 1.10/1.50 6/1000 90L 59 4-5 Days
BMT1110.10J814.11 B14 (Flange) 1.10/1.50 8/750 100L 59 4-5 Days
BMT1110.10J803.11 B3 (Feet) 1.10/1.50 8/750 100L 59 4-5 Days
BMT1110.10J834.11 B3/B14 (Feet & Flange) 1.10/1.50 8/750 100L 59 4-5 Days
BMT1110.10J835.11 B3/B5 (Feet & Flange) 1.10/1.50 8/750 100L 59 4-5 Days
BMT1110.10J805.11 B5 (Flange) 1.10/1.50 8/750 100L 59 4-5 Days
BMT1150.09A214.11 B14 (Flange) 1.50/2.04 2/3000 90S 72 4-5 Days
BMT1150.08D214.11 B14 (Flange) 1.50/2.04 2/3000 80 70 4-5 Days
BMT1150.09A203.11 B3 (Feet) 1.50/2.04 2/3000 90S 72 4-5 Days
BMT1150.08D203.11 B3 (Feet) 1.50/2.04 2/3000 80 70 4-5 Days
BMT1150.09A234.11 B3/B14 (Feet & Flange) 1.50/2.04 2/3000 90S 72 4-5 Days
BMT1150.08D234.11 B3/B14 (Feet & Flange) 1.50/2.04 2/3000 80 70 4-5 Days
BMT1150.09A235.11 B3/B5 (Feet & Flange) 1.50/2.04 2/3000 90S 72 4-5 Days
BMT1150.08D235.11 B3/B5 (Feet & Flange) 1.50/2.04 2/3000 80 70 4-5 Days
BMT1150.09A205.11 B5 (Flange) 1.50/2.04 2/3000 90S 72 4-5 Days
BMT1150.08D205.11 B5 (Flange) 1.50/2.04 2/3000 80 72 4-5 Days
BMT1150.09I414.11 B14 (Flange) 1.50/2.04 4/1500 90L 61 4-5 Days
BMT1150.09I403.11 B3 (Feet) 1.50/2.04 4/1500 90L 61 4-5 Days
BMT1150.09I434.11 B3/B14 (Feet & Flange) 1.50/2.04 4/1500 90L 61 4-5 Days
BMT1150.09I435.11 B3/B5 (Feet & Flange) 1.50/2.04 4/1500 90L 61 4-5 Days
BMT1150.09I405.11 B5 (Flange) 1.50/2.04 4/1500 90L 61 4-5 Days
BMT1150.10H614.11 B14 (Flange) 1.50/2.04 6/1000 100L 61 4-5 Days
BMT1150.09J614.11 B14 (Flange) 1.50/2.04 6/1000 90L 61 4-5 Days
BMT1150.10H603.11 B3 (Feet) 1.50/2.04 6/1000 100L 61 4-5 Days
BMT1150.09J603.11 B3 (Feet) 1.50/2.04 6/1000 90L 61 4-5 Days
BMT1150.10H634.11 B3/B14 (Feet & Flange) 1.50/2.04 6/1000 100L 61 4-5 Days
BMT1150.09J634.11 B3/B14 (Feet & Flange) 1.50/2.04 6/1000 90L 61 4-5 Days
BMT1150.10H635.11 B3/B5 (Feet & Flange) 1.50/2.04 6/1000 100L 61 4-5 Days
BMT1150.09J635.11 B3/B5 (Feet & Flange) 1.50/2.04 6/1000 90L 61 4-5 Days
BMT1150.10H605.11 B5 (Flange) 1.50/2.04 6/1000 100L 61 4-5 Days
BMT1150.09J605.11 B5 (Flange) 1.50/2.04 6/1000 90L 61 4-5 Days
BMT1150.11D814.11 B14 (Flange) 1.50/2.04 8/750 112M 61 4-5 Days
BMT1150.11D803.11 B3 (Feet) 1.50/2.04 8/750 112M 61 4-5 Days
BMT1150.11D834.11 B3/B14 (Feet & Flange) 1.50/2.04 8/750 112M 61 4-5 Days
BMT1150.11D835.11 B3/B5 (Feet & Flange) 1.50/2.04 8/750 112M 61 4-5 Days
BMT1150.11D805.11 B5 (Flange) 1.50/2.04 8/750 112M 61 4-5 Days
BMT1110.16E214.11 B14 (Flange) 11.00/14.96 2/3000 160M 86 4-5 Days
BMT1110.13F214.11 B14 (Flange) 11.00/14.96 2/3000 132M 83 4-5 Days
BMT1110.16E203.11 B3 (Feet) 11.00/14.96 2/3000 160M 86 4-5 Days
BMT1110.13F203.11 B3 (Feet) 11.00/14.96 2/3000 132M 83 4-5 Days
BMT1110.16E234.11 B3/B14 (Feet & Flange) 11.00/14.96 2/3000 160M 86 4-5 Days
BMT1110.13F234.11 B3/B14 (Feet & Flange) 11.00/14.96 2/3000 132M 83 4-5 Days
BMT1110.16E235.11 B3/B5 (Feet & Flange) 11.00/14.96 2/3000 160M 86 4-5 Days
BMT1110.13F235.11 B3/B5 (Feet & Flange) 11.00/14.96 2/3000 132M 83 4-5 Days
BMT1110.16E205.11 B5 (Flange) 11.00/14.96 2/3000 160M 86 4-5 Days
BMT1110.13F205.11 B5 (Flange) 11.00/14.96 2/3000 132M 83 4-5 Days
BMT1100.16D414.11 B14 (Flange) 11.00/14.96 4/1500 160M 75 4-5 Days
BMT1100.13G414.11 B14 (Flange) 11.00/14.96 4/1500 132M 75 4-5 Days
BMT1100.16D403.11 B3 (Feet) 11.00/14.96 4/1500 160M 75 4-5 Days
BMT1100.13G403.11 B3 (Feet) 11.00/14.96 4/1500 132M 75 4-5 Days
BMT1100.16D434.11 B3/B14 (Feet & Flange) 11.00/14.96 4/1500 160M 75 4-5 Days
BMT1100.13G434.11 B3/B14 (Feet & Flange) 11.00/14.96 4/1500 132M 75 4-5 Days
BMT1100.16D435.11 B3/B5 (Feet & Flange) 11.00/14.96 4/1500 160M 75 4-5 Days
BMT1100.13G435.11 B3/B5 (Feet & Flange) 11.00/14.96 4/1500 132M 75 4-5 Days
BMT1100.16D405.11 B5 (Flange) 11.00/14.96 4/1500 160M 75 4-5 Days
BMT1100.13G405.11 B5 (Flange) 11.00/14.96 4/1500 132M 75 4-5 Days
BMT1110.16I614.11 B14 (Flange) 11.00/14.96 6/1000 160L 73 4-5 Days
BMT1110.16I603.11 B3 (Feet) 11.00/14.96 6/1000 160L 73 4-5 Days
BMT1110.16I634.11 B3/B14 (Feet & Flange) 11.00/14.96 6/1000 160L 73 4-5 Days
BMT1110.16I635.11 B3/B5 (Feet & Flange) 11.00/14.96 6/1000 160L 73 4-5 Days
BMT1110.16I605.11 B5 (Flange) 11.00/14.96 6/1000 160L 73 4-5 Days
BMT1150.16F214.11 B14 (Flange) 15.00/20.39 2/3000 160M 86 4-5 Days
BMT1150.13G214.11 B14 (Flange) 15.00/20.39 2/3000 132M 86 4-5 Days
BMT1150.16F203.11 B3 (Feet) 15.00/20.39 2/3000 160M 86 4-5 Days
BMT1150.13G203.11 B3 (Feet) 15.00/20.39 2/3000 132M 86 4-5 Days
BMT1150.16F234.11 B3/B14 (Feet & Flange) 15.00/20.39 2/3000 160M 86 4-5 Days
BMT1150.13G234.11 B3/B14 (Feet & Flange) 15.00/20.39 2/3000 132M 86 4-5 Days
BMT1150.16F235.11 B3/B5 (Feet & Flange) 15.00/20.39 2/3000 160M 86 4-5 Days
BMT1150.13G235.11 B3/B5 (Feet & Flange) 15.00/20.39 2/3000 132M 86 4-5 Days
BMT1150.16F205.11 B5 (Flange) 15.00/20.39 2/3000 160M 86 4-5 Days
BMT1150.13G205.11 B5 (Flange) 15.00/20.39 2/3000 132M 86 4-5 Days
BMT1150.16I414.11 B14 (Flange) 15.00/20.39 4/1500 160L 75 4-5 Days
BMT1150.16I403.11 B3 (Feet) 15.00/20.39 4/1500 160L 75 4-5 Days
BMT1150.16I434.11 B3/B14 (Feet & Flange) 15.00/20.39 4/1500 160L 75 4-5 Days
BMT1150.16I435.11 B3/B5 (Feet & Flange) 15.00/20.39 4/1500 160L 75 4-5 Days
BMT1150.16I405.11 B5 (Flange) 15.00/20.39 4/1500 160L 75 4-5 Days
BMT1150.16J614.11 B14 (Flange) 15.00/20.39 6/1000 160L 79 4-5 Days
BMT1150.16J603.11 B3 (Feet) 15.00/20.39 6/1000 160L 79 4-5 Days
BMT1150.16J634.11 B3/B14 (Feet & Flange) 15.00/20.39 6/1000 160L 79 4-5 Days
BMT1150.16J635.11 B3/B5 (Feet & Flange) 15.00/20.39 6/1000 160L 79 4-5 Days
BMT1150.16J605.11 B5 (Flange) 15.00/20.39 6/1000 160L 79 4-5 Days
BMT1185.16I214.11 B14 (Flange) 18.50/25.15 2/3000 160L 86 4-5 Days
BMT1185.16I203.11 B3 (Feet) 18.50/25.15 2/3000 160L 86 4-5 Days
BMT1185.16I234.11 B3/B14 (Feet & Flange) 18.50/25.15 2/3000 160L 86 4-5 Days
BMT1185.16I235.11 B3/B5 (Feet & Flange) 18.50/25.15 2/3000 160L 86 4-5 Days
BMT1185.16I205.11 B5 (Flange) 18.50/25.15 2/3000 160L 86 4-5 Days
BMT1118.16J414.11 B14 (Flange) 18.50/25.15 4/1500 160L 78 4-5 Days
BMT1118.16J403.11 B3 (Feet) 18.50/25.15 4/1500 160L 78 4-5 Days
BMT1118.16J434.11 B3/B14 (Feet & Flange) 18.50/25.15 4/1500 160L 78 4-5 Days
BMT1118.16J435.11 B3/B5 (Feet & Flange) 18.50/25.15 4/1500 160L 78 4-5 Days
BMT1118.16J405.11 B5 (Flange) 18.50/25.15 4/1500 160L 78 4-5 Days
BMT1220.09I214.11 B14 (Flange) 2.20/2.99 2/3000 90L 72 4-5 Days
BMT1220.09I203.11 B3 (Feet) 2.20/2.99 2/3000 90L 72 4-5 Days
BMT1220.09I234.11 B3/B14 (Feet & Flange) 2.20/2.99 2/3000 90L 72 4-5 Days
BMT1220.09I235.11 B3/B5 (Feet & Flange) 2.20/2.99 2/3000 90L 72 4-5 Days
BMT1220.09I205.11 B5 (Flange) 2.20/2.99 2/3000 90L 72 4-5 Days
BMT1220.10I414.11 B14 (Flange) 2.20/2.99 4/1500 100L 64 4-5 Days
BMT1220.09J414.11 B14 (Flange) 2.20/2.99 4/1500 90L 64 1-2 Days
BMT1220.10I403.11 B3 (Feet) 2.20/2.99 4/1500 100L 64 4-5 Days
BMT1220.10I434.11 B3/B14 (Feet & Flange) 2.20/2.99 4/1500 100L 64 4-5 Days
BMT1220.09J434.11 B3/B14 (Feet & Flange) 2.20/2.99 4/1500 90L 64 4-5 Days
BMT1220.10I435.11 B3/B5 (Feet & Flange) 2.20/2.99 4/1500 100L 64 4-5 Days
BMT1220.09J435.11 B3/B5 (Feet & Flange) 2.20/2.99 4/1500 90L 64 4-5 Days
BMT1220.10I405.11 B5 (Flange) 2.20/2.99 4/1500 100L 64 4-5 Days
BMT1220.11E614.11 B14 (Flange) 2.20/2.99 6/1000 112M 64 4-5 Days
BMT1220.10J614.11 B14 (Flange) 2.20/2.99 6/1000 100L 64 4-5 Days
BMT1220.11E603.11 B3 (Feet) 2.20/2.99 6/1000 112M 64 4-5 Days
BMT1220.10J603.11 B3 (Feet) 2.20/2.99 6/1000 100L 64 4-5 Days
BMT1220.11E634.11 B3/B14 (Feet & Flange) 2.20/2.99 6/1000 112M 64 4-5 Days
BMT1220.10J634.11 B3/B14 (Feet & Flange) 2.20/2.99 6/1000 100L 64 4-5 Days
BMT1220.11E635.11 B3/B5 (Feet & Flange) 2.20/2.99 6/1000 112M 64 4-5 Days
BMT1220.10J635.11 B3/B5 (Feet & Flange) 2.20/2.99 6/1000 100L 64 4-5 Days
BMT1220.11E605.11 B5 (Flange) 2.20/2.99 6/1000 112M 64 4-5 Days
BMT1220.10J605.11 B5 (Flange) 2.20/2.99 6/1000 100L 64 4-5 Days
BMT1220.13A814.11 B14 (Flange) 2.20/2.99 8/750 132S 64 4-5 Days
BMT1220.13A803.11 B3 (Feet) 2.20/2.99 8/750 132S 64 4-5 Days
BMT1220.13A834.11 B3/B14 (Feet & Flange) 2.20/2.99 8/750 132S 64 4-5 Days
BMT1220.13A835.11 B3/B5 (Feet & Flange) 2.20/2.99 8/750 132S 64 4-5 Days
BMT1220.13A805.11 B5 (Flange) 2.20/2.99 8/750 132S 64 4-5 Days
BMT1220.16J214.11 B14 (Flange) 22.00/29.91 2/3000 160L 91 4-5 Days
BMT1220.16J203.11 B3 (Feet) 22.00/29.91 2/3000 160L 91 4-5 Days
BMT1220.16J234.11 B3/B14 (Feet & Flange) 22.00/29.91 2/3000 160L 91 4-5 Days
BMT1220.16J235.11 B3/B5 (Feet & Flange) 22.00/29.91 2/3000 160L 91 4-5 Days
BMT1220.16J205.11 B5 (Flange) 22.00/29.91 2/3000 160L 91 4-5 Days
BMT1220.16K414.11 B14 (Flange) 22.00/29.91 4/1500 160L 80 4-5 Days
BMT1220.16K403.11 B3 (Feet) 22.00/29.91 4/1500 160L 80 4-5 Days
BMT1220.16K434.11 B3/B14 (Feet & Flange) 22.00/29.91 4/1500 160L 80 4-5 Days
BMT1220.16K435.11 B3/B5 (Feet & Flange) 22.00/29.91 4/1500 160L 80 4-5 Days
BMT1220.16K405.11 B5 (Flange) 22.00/29.91 4/1500 160L 80 4-5 Days
BMT1300.09J214.11 B14 (Flange) 3.00/4.08 2/3000 90L 64 4-5 Days
BMT1300.10I214.11 B14 (Flange) 3.00/4.08 2/3000 100L 64 4-5 Days
BMT1300.09J203.11 B3 (Feet) 3.00/4.08 2/3000 90L 64 4-5 Days
BMT1300.10I203.11 B3 (Feet) 3.00/4.08 2/3000 100L 64 4-5 Days
BMT1300.09J234.11 B3/B14 (Feet & Flange) 3.00/4.08 2/3000 90L 64 4-5 Days
BMT1300.10I234.11 B3/B14 (Feet & Flange) 3.00/4.08 2/3000 100L 64 4-5 Days
BMT1300.09J235.11 B3/B5 (Feet & Flange) 3.00/4.08 2/3000 90L 64 4-5 Days
BMT1300.10I235.11 B3/B5 (Feet & Flange) 3.00/4.08 2/3000 100L 64 4-5 Days
BMT1300.09J205.11 B5 (Flange) 3.00/4.08 2/3000 90L 64 4-5 Days
BMT1300.10I205.11 B5 (Flange) 3.00/4.08 2/3000 100L 64 4-5 Days
BMT1300.10J414.11 B14 (Flange) 3.00/4.08 4/1500 100L 64 4-5 Days
BMT1300.10J403.11 B3 (Feet) 3.00/4.08 4/1500 100L 64 4-5 Days
BMT1300.10J434.11 B3/B14 (Feet & Flange) 3.00/4.08 4/1500 100L 64 4-5 Days
BMT1300.10J435.11 B3/B5 (Feet & Flange) 3.00/4.08 4/1500 100L 64 4-5 Days
BMT1300.10J405.11 B5 (Flange) 3.00/4.08 4/1500 100L 64 4-5 Days
BMT1300.13A614.11 B14 (Flange) 3.00/4.08 6/1000 132S 64 4-5 Days
BMT1300.11F614.11 B14 (Flange) 3.00/4.08 6/1000 112M 64 4-5 Days
BMT1300.13A603.11 B3 (Feet) 3.00/4.08 6/1000 132S 64 4-5 Days
BMT1300.11F603.11 B3 (Feet) 3.00/4.08 6/1000 112M 64 4-5 Days
BMT1300.13A634.11 B3/B14 (Feet & Flange) 3.00/4.08 6/1000 132S 64 4-5 Days
BMT1300.11F634.11 B3/B14 (Feet & Flange) 3.00/4.08 6/1000 112M 64 4-5 Days
BMT1300.13A635.11 B3/B5 (Feet & Flange) 3.00/4.08 6/1000 132S 64 4-5 Days
BMT1300.11F635.11 B3/B5 (Feet & Flange) 3.00/4.08 6/1000 112M 64 4-5 Days
BMT1300.13A605.11 B5 (Flange) 3.00/4.08 6/1000 132S 64 4-5 Days
BMT1300.11F605.11 B5 (Flange) 3.00/4.08 6/1000 112M 64 4-5 Days
BMT1300.13D814.11 B14 (Flange) 3.00/4.08 8/750 132M 64 4-5 Days
BMT1300.13D803.11 B3 (Feet) 3.00/4.08 8/750 132M 64 4-5 Days
BMT1300.13D834.11 B3/B14 (Feet & Flange) 3.00/4.08 8/750 132M 64 4-5 Days
BMT1300.13D835.11 B3/B5 (Feet & Flange) 3.00/4.08 8/750 132M 64 4-5 Days
BMT1300.13D805.11 B5 (Flange) 3.00/4.08 8/750 132M 64 4-5 Days
BMT1400.11E214.11 B14 (Flange) 4.00/5.44 2/3000 112M 77 4-5 Days
BMT1400.10J214.11 B14 (Flange) 4.00/5.44 2/3000 100L 77 1-2 Days
BMT1400.11E203.11 B3 (Feet) 4.00/5.44 2/3000 112M 77 4-5 Days
BMT1400.10J203.11 B3 (Feet) 4.00/5.44 2/3000 100L 77 1-2 Days
BMT1400.11E234.11 B3/B14 (Feet & Flange) 4.00/5.44 2/3000 112M 77 4-5 Days
BMT1400.10J234.11 B3/B14 (Feet & Flange) 4.00/5.44 2/3000 100L 77 4-5 Days
BMT1400.11E235.11 B3/B5 (Feet & Flange) 4.00/5.44 2/3000 112M 77 4-5 Days
BMT1400.10J235.11 B3/B5 (Feet & Flange) 4.00/5.44 2/3000 100L 77 4-5 Days
BMT1400.11E205.11 B5 (Flange) 4.00/5.44 2/3000 112M 77 4-5 Days
BMT1400.10J205.11 B5 (Flange) 4.00/5.44 2/3000 100L 77 4-5 Days
BMT1400.11E414.11 B14 (Flange) 4.00/5.44 4/1500 112M 65 4-5 Days
BMT1400.10K414.11 B14 (Flange) 4.00/5.44 4/1500 100L 65 4-5 Days
BMT1400.11E403.11 B3 (Feet) 4.00/5.44 4/1500 112M 65 4-5 Days
BMT1400.10K403.11 B3 (Feet) 4.00/5.44 4/1500 100L 65 4-5 Days
BMT1400.11E434.11 B3/B14 (Feet & Flange) 4.00/5.44 4/1500 112M 65 4-5 Days
BMT1400.10K434.11 B3/B14 (Feet & Flange) 4.00/5.44 4/1500 100L 65 4-5 Days
BMT1400.11E435.11 B3/B5 (Feet & Flange) 4.00/5.44 4/1500 112M 65 4-5 Days
BMT1400.10K435.11 B3/B5 (Feet & Flange) 4.00/5.44 4/1500 100L 65 4-5 Days
BMT1400.11E405.11 B5 (Flange) 4.00/5.44 4/1500 112M 65 4-5 Days
BMT1400.10K405.11 B5 (Flange) 4.00/5.44 4/1500 100L 65 4-5 Days
BMT1400.13E614.11 B14 (Flange) 4.00/5.44 6/1000 132M 68 4-5 Days
BMT1400.13E603.11 B3 (Feet) 4.00/5.44 6/1000 132M 68 4-5 Days
BMT1400.13E634.11 B3/B14 (Feet & Flange) 4.00/5.44 6/1000 132M 68 4-5 Days
BMT1400.13E635.11 B3/B5 (Feet & Flange) 4.00/5.44 6/1000 132M 68 4-5 Days
BMT1400.13E605.11 B5 (Flange) 4.00/5.44 6/1000 132M 68 4-5 Days
BMT1400.16E814.11 B14 (Flange) 4.00/5.44 8/750 160M 68 4-5 Days
BMT1400.16E803.11 B3 (Feet) 4.00/5.44 8/750 160M 68 4-5 Days
BMT1400.16E834.11 B3/B14 (Feet & Flange) 4.00/5.44 8/750 160M 68 4-5 Days
BMT1400.16E835.11 B3/B5 (Feet & Flange) 4.00/5.44 8/750 160M 68 4-5 Days
BMT1400.16E805.11 B5 (Flange) 4.00/5.44 8/750 160M 68 4-5 Days
BMT1550.13B214.11 B14 (Flange) 5.50/7.48 2/3000 132S 80 4-5 Days
BMT1550.11F214.11 B14 (Flange) 5.50/7.48 2/3000 112M 78 4-5 Days
BMT1550.13B203.11 B3 (Feet) 5.50/7.48 2/3000 132S 80 4-5 Days
BMT1550.11F203.11 B3 (Feet) 5.50/7.48 2/3000 112M 78 4-5 Days
BMT1550.13B234.11 B3/B14 (Feet & Flange) 5.50/7.48 2/3000 132S 80 4-5 Days
BMT1550.11F234.11 B3/B14 (Feet & Flange) 5.50/7.48 2/3000 112M 78 4-5 Days
BMT1550.13B235.11 B3/B5 (Feet & Flange) 5.50/7.48 2/3000 132S 80 4-5 Days
BMT1550.11F235.11 B3/B5 (Feet & Flange) 5.50/7.48 2/3000 112M 78 4-5 Days
BMT1550.13B205.11 B5 (Flange) 5.50/7.48 2/3000 132S 80 4-5 Days
BMT1550.11F205.11 B5 (Flange) 5.50/7.48 2/3000 112M 78 4-5 Days
BMT1550.13A414.11 B14 (Flange) 5.50/7.48 4/1500 132S 71 4-5 Days
BMT1550.11F414.11 B14 (Flange) 5.50/7.48 4/1500 112M 71 1-2 Days
BMT1550.13A403.11 B3 (Feet) 5.50/7.48 4/1500 132S 71 4-5 Days
BMT1550.13A434.11 B3/B14 (Feet & Flange) 5.50/7.48 4/1500 132S 71 4-5 Days
BMT1550.11F434.11 B3/B14 (Feet & Flange) 5.50/7.48 4/1500 112M 71 4-5 Days
BMT1550.13A435.11 B3/B5 (Feet & Flange) 5.50/7.48 4/1500 132S 71 4-5 Days
BMT1550.11F435.11 B3/B5 (Feet & Flange) 5.50/7.48 4/1500 112M 71 4-5 Days
BMT1550.13A405.11 B5 (Flange) 5.50/7.48 4/1500 132S 71 4-5 Days
BMT1550.11F405.11 B5 (Flange) 5.50/7.48 4/1500 112M 71 1-2 Days
BMT1550.13F614.11 B14 (Flange) 5.50/7.48 6/1000 132M 68 4-5 Days
BMT1550.13F603.11 B3 (Feet) 5.50/7.48 6/1000 132M 68 4-5 Days
BMT1550.13F634.11 B3/B14 (Feet & Flange) 5.50/7.48 6/1000 132M 68 4-5 Days
BMT1550.13F635.11 B3/B5 (Feet & Flange) 5.50/7.48 6/1000 132M 68